    Referenz: 20170875
    Veröffentlichungsdatum: 6 Juni 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    ELLOMAY CAPITAL LTD

    Ort

    Beschreibung

    The project consists of the construction and operation of a solar photovoltaic plant with a total capacity of 300 megawatt-peak (MWp) located in western Spain near the city of Caceres, Extremadura.

    Ziele

    This project will enable the construction of a renewable energy plant in a less-developed region in Spain.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 70 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 226 million

    Umweltaspekte

    The project grid connection falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EC. Both the power plant and its grid connection have undergone, in line with local legislation, a full Environmental Impact Assessment which has been submitted to the competent authorities. The environmental permit was issued in November 2014. The Bank will assess the compliance of the authorisation procedure with the relevant EU directives and other environmental aspects of the project during appraisal.

    Auftragsvergabe

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/23/EU / 2014/24/EU or 2004/18/EC / 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation referenced above as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    Unterzeichnet - 20/12/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).