Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170837
    Veröffentlichungsdatum: 14 Februar 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    FERROVIENORD SPA,REGIONE LOMBARDIA

    Ort

    Beschreibung

    The project consists of the acquisition of 161 new train sets to replace obsolete rolling stock for suburban and regional services in the Italian Lombardy Region.

    Ziele

    The project will contribute to increasing the quality of passenger rail services in Lombardy. The new rolling stock is expected to allow more efficient operation, reduce maintenance costs, lower energy consumption and increase the level of comfort for passengers. Indirectly, by improving services, the renewal of rolling stock will help railways to compete with other transportation modes, particularly private vehicles, so as to maintain or improve its modal share. Shifting passenger flows from other modes to rail may result in reduced vehicle operation costs, as well as safety and environmental benefits.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 650 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1607 million

    Umweltaspekte

    The project will promote a modal shift from road to rail and, therefore, generate environmental and safety benefits. The acquisition of rolling stock is out of the scope of the Environmental Impact Assessment Directive (2011/92/EU), the Habitats Directive (92/43/EEC) as well the Birds Directive (2009/147/EC). No associated facilities are planned to be built; this will be confirmed at the appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation - Directive 2014/25/EU - as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.

    Projektstatus

    Unterzeichnet - 31/05/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Verkehr