Veröffentlichungsdatum: 25 Oktober 2017
Projektträger – zwischengeschaltetes Finanzinstitut
ITALGAS RETI SPAOrt
Beschreibung
The project is part of the promoter's on-going investment programme to upgrade and extend its gas distribution networks. The project includes (i) pipeline replacements (ii) extension of the networks with the associated connections and metering (iii) installation of smart meters and (iv) other supplementary investments to optimise and increase the efficiency of network management.
Ziele
The project will contribute to improvements in security, safety and reliability of gas supply. The planned investments are aligned with the requirements of the regulatory framework, and should increase network and community safety, improving reliability and reducing the occurrence of leakages.
Sektor(en)
- Energie - Energieversorgung
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 360 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 730 million
Umweltaspekte
Based on their technical characteristics, the planned gas distribution system investment schemes most likely will not require an Environmental Impact Assessment (EIA). The project schemes are expected to have minimal environmental impact. The typically anticipated impacts are mainly temporary and relate to construction works. These impacts can usually be well managed by appropriate measures taken by the construction company in order to avoid unacceptable nuisance to other parties and the public.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, (Directive 2014/24/EU and 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.
Projektstatus
Unterzeichnet - 19/12/2017
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).