Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170625
    Veröffentlichungsdatum: 20 Februar 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    PUBLIC ENTITY(IES)

    Ort

    Beschreibung

    The project, located in the Walloon Brabant area of Belgium, concerns (i) the upgrade of water supply and solid waste collection infrastructure and (ii) eligible investments in public buildings.

    Ziele

    The project will contribute to Environmental Protection, Natural Resource Efficiency as well as an integrated territorial development.

    Kommentar(e)

    -

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 80 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 180 million

    Umweltaspekte

    The project's water supply components will contribute to ensure compliance with key EU directives in the water sector notably the Drinking Water Directive (98/83/CE) and the Water Framework Directive (2000/60/EC). The project's solid waste components shall be implemented in full compliance with the Solid Waste Framework Directive (2008/98/CE). The refurbishment of buildings shall be done in compliance with the EU Directive on Energy Performance of Buildings (2010/31/EU). Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by 2014/52/EU and the Strategic Environmental Assessment (SEA) Directive 2001/42/EC will be respected. The promoter will, in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. For any parts of the project that may impact a nature conservation site, the promoter will be required to provide to the Bank an approval of the competent authority and information on the mitigating measures required to comply with the Habitats Directive 92/43/EEC.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    Unterzeichnet - 18/12/2019

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Belgien Wasser, Abwasser Müllbeseitigung Stadtentwicklung Kombinierte Infrastrukturvorhaben