Veröffentlichungsdatum: 8 November 2017
Projektträger – zwischengeschaltetes Finanzinstitut
TDC A/SOrt
Beschreibung
The project concerns the promoter's investments in Denmark to increase mobile coverage and capacity, to upgrade and expand the coax network, to enhance and expand the fiber access networks and upgrade the existing copper access as well as cable TV networks. The project will be implemented during 2017-2020.
Ziele
The project aims at developing the promoter's technological infrastructure, therefore enhancing its telecommunication services.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 500 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 1017 million
Umweltaspekte
Investments in fixed telecommunications projects (mainly civil works for urban underground copper/fibre roll-out) do not fall under Annex I and II of Directive 2011/92/EC. The related works have typically limited residual environmental effects as they are carried out in populated areas as well as alongside roads. Nevertheless, the environmental details including the CO2 footprint (if needed) and the possible impacts on protected flora and fauna (Habitats 92/43/EEC and Birds 79/409/EEC Directives) will be assessed during the appraisal.
Auftragsvergabe
The promoter is a private company not operating in the utilities sector and not having a status of a contracting authority. Thus, it is not covered by the EU directives on procurement.
Projektstatus
Unterzeichnet - 8/11/2017
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).