Veröffentlichungsdatum: 26 März 2018
Projektträger – zwischengeschaltetes Finanzinstitut
MINISTERE DE L'EQUIPEMENT,DE L'AMENAGEMENT DU TERRITOIREOrt
Beschreibung
Widening to 2x2 lanes of a 53 km long section of the MC27 regional road between the towns of Nabeul and Kélibia, and construction of a bypass on a new alignment around the city of Korba.
Ziele
The project is included in the Five-Year Development Plan of Tunisia 2016-2020 under the Voiries Structurantes programme. Current traffic levels on the existing road are close to capacity and sections in urban and sub-urban areas suffer regular congestion. The project will provide some relief with two additional lanes in the interurban sections and a bypass around the town of Korba.
Sektor(en)
- Verkehr - Verkehr und Lagerei
Garantie im Rahmen des Außenmandats
This operation is covered by the ELM Guarantee.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 47 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 94 million
Umweltaspekte
If the project was located within the EU, it would fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EC (as amended by Directive 2014/52/EU), thus requiring a full EIA. One main EIA procedure including a public consultation has been carried out in accordance with national legislation in Tunisia. A Resettlement Policy Framework has been prepared. The Bank investigates environmental and social aspects during appraisal and verifies that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank also verifies the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures.
Auftragsvergabe
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Projektstatus
Genehmigt - 20/11/2017
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).