Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20160931
Veröffentlichungsdatum: 4 Dezember 2017

Projektträger – zwischengeschaltetes Finanzinstitut

GRUPA AZOTY SA

Ort

Beschreibung

The investment programme includes the upgrade of the promoter's existing production facilities and RDI activities aiming at increased efficiency and securing an environmentally sustainable production.

Ziele

This is an extensive long-term investment to optimise the promoter's production processes and reduce production costs, while improving environmental performance and energy efficiency. These measures will contribute to strengthen the company's image on the market by optimising its product offer of fertilisers and plastics and respond to the growing demand in Poland for higher value-added plastics from the automotive and other sectors employing structural fibres. The project is located in less-developed EU regions, and is therefore eligible under Article 309 points a) projects for developing less-developed regions (economic and social cohesion) and c) common interest (improvement of environmental performance).

Sektor(en)

  • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 145 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 296 million

Umweltaspekte

The project is conducted within existing industrial sites and in compliance with Best Available Technology (BAT). All components fall under annex II of the Directive 2011/92/EU as it relates to changes or extensions of already authorised activities. It is thus up to the relevant competent authorities to decide upon the requirement of an Environmental Impact Assessment (EIA). The EIA process, status and decisions will be verified in detail during appraisal.

Auftragsvergabe

The promoter is a private company not operating in the utilities sector and not having a status of a contracting authority. Thus, it is not covered by the EU directives on procurement. Procedures followed will be verified during appraisal.

Projektstatus

Unterzeichnet - 25/01/2018

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Industrie