Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20160865
    Veröffentlichungsdatum: 3 April 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    The borrower is Nacional Financiera SNC (NAFIN), who will on-lend to an acceptable corporate.

    Ort

    Beschreibung

    The project is an allocation under the Mexico Climate Action framework loan which will be intermediated by NAFIN (Nacional Financiera). The project concerns the construction of a 199.5 MW wind farm in Mexico. The wind farm comprises 95 wind turbine generators (WTGs), rated at 2.1 MW each, and associated infrastructure, including access roads, control centre and interconnection to the grid.

    Ziele

    The project aims to help meet the Mexican national target of 35% of electricity generated from renewable energy sources by 2024. It is also consistent with the EIB's objectives outside the European Union, contributing to the promotion of renewable energy generation, and will contribute to the attainment of the UN Sustainable Development Goal (SDG) on climate action.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    USD 40 million (EUR 34 million)

    Gesamtkosten (voraussichtlicher Betrag)

    USD 351 million (EUR 297 million)

    Umweltaspekte

    If the plant was located within the EU it would fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), requiring the competent authorities to determine whether an EIA is required. Following Mexican national legislation a full EIA is mandatory for the project. Due to the specificities of the land tenancy in Mexico and the vulnerability of certain groups, the social impact will be carefully assessed at appraisal. Compliance with the EIB's environmental and social standards, with national law and EU environmental and social principles with particular reference to EU environmental horizontal directives, stakeholder engagement, access to information and impact on biodiversity and cumulative impact will also be verified at appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Genehmigt - 29/09/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Mexiko Energie