Veröffentlichungsdatum: 6 Oktober 2017
Projektträger – zwischengeschaltetes Finanzinstitut
DEUTSCHE TELEKOM AGOrt
Beschreibung
The project concerns the third roll-out phase of a very-high speed broadband access network in Germany. The specific measures will include: - increased fiber coverage in the access network - installation of a more advanced copper access technology for additional 9% of German households to meet at least 30 Mbps - the roll-out of a latest innovation allowing for broadband speed levels up to even 250 Mbps The project will be implemented during 2017 and 2018.
Ziele
The operation contributes to the objectives of the Europe 2020 Strategy and the Digital Agenda for Europe initiative.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 400 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 1187 million
Umweltaspekte
Investments in fixed telecommunications projects (mainly civil works for urban underground copper/fibre roll-out) do not fall under Annex I and II of Directive 2011/92/EC as amended. The related works have typically limited residual environmental effects, as they are mainly carried out in urban areas alongside roads.
Auftragsvergabe
Procurement is expected to be in line with EIB guidelines for private sector projects. The Bank's services will verify details during the project due diligence.
Projektstatus
Unterzeichnet - 6/10/2017
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).