Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20160512
    Veröffentlichungsdatum: 16 Mai 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    NETIA SA

    Ort

    Beschreibung

    The project relates to the modernisation of the existing access network with the latest fibre broadband technologies in Poland.

    Ziele

    After the project implementation the entire own network will be able to provide at least very high speed broadband services (> 100 Mbps) including TV and voice services.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 50 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 103 million

    Umweltaspekte

    Investments in fixed telecommunications projects (mainly civil works for urban underground copper/fibre roll-out) do not fall under Annex I or II of Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU. The related works have limited residual environmental effects, as the trenching works are typically carried out alongside roads and make use of the latest technologies to limit the civil works impact as much as possible.

    Auftragsvergabe

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement and concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2014/25/EU), then the Bank would require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 24/10/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Telekommunikation