    Referenz: 20160406
    Veröffentlichungsdatum: 31 August 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    PUBLIC ENTITY(IES)

    Ort

    Beschreibung

    The multi-sector framework loan will support the integrated rehabilitation and reconstruction of the province of Manabi, particularly on the sub-region of Portoviejo, which is one of the regions most affected by the recent earthquake

    Ziele

    The proposed project is a framework loan to finance reconstruction of small scale, multi sector damaged infrastructure investments to cope with the consequences of the 2016 Ecuador earthquake in the sectors and areas such as: (i) rehabilitation and/or reconstruction of public buildings under proper anti-seismic and energy efficiency standards (regional and municipal buildings and social infrastructure such as schools, health centers, hospitals, social centers and other relevant buildings); (ii) recovery and reestablishment of water supply and sanitation, including network repairs, captation, pumping stations, treatment plants; (iii) recovery and reestablishment of energy supply, including grid repairs and substations; (iv) recovery and reestablishment of public telecommunication networks; (v) recovery of local and regional roads damaged by the earthquake (vi) repair and refurbishment of markets and other community buildings; and (vii) other relevant actions to be determined.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    USD 175 million (EUR 159 million)

    Gesamtkosten (voraussichtlicher Betrag)

    USD 175 million (EUR 159 million)

    Umweltaspekte

    The large majority of the investments foreseen by the project are reconstruction, repairs and refurbishment under proper anti-seismic standards of collapsed and damaged infrastructure in sectors mentioned above. Road infrastructure works are to be constructed within existing rights of way or on new alignment over short sections. Therefore potential negative environmental impacts are likely to be minor. If situated in the EU, these schemes would likely fall under Annex II of EIA Directive 2011/92/EU and therefore be subject to screening. Some of the schemes nevertheless might require an EIA. Appropriate screening procedures, also in relation to natural habitats and protected species, as well as land acquisition/resettlement will be put in place. Given the complex situation, the relevant analysis of social risks and impacts of the project will also be dully carried out as part of the appraisal, in accordance with the EIB Social Standards.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 17/11/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ecuador Industrie