Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20160241
    Veröffentlichungsdatum: 5 September 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    EGEA ENTE GESTIONE ENERGIA E AMBIENTE SPA

    Ort

    Beschreibung

    The project comprises part of the multi-annual investment programme of the promoter's group, focusing on three of its business areas: district heating, water and waste collection.

    Ziele

    The main purpose of the project is to develop and optimise the district heating supply services to better serve existing and future demand. The project is expected to reduce CO2 and other pollutants emissions, by replacing individual smaller, fossil-fuel-fired heating boilers in residential and public buildings. The water components aim to improve sustainability and efficiency. Investments in waste management facilities should contribute to improving the waste management system in the service areas of the promoter by improving selective waste collection and increasing the share of municipal waste subject to recovery, treatment and recycling.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 50 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 110 million

    Umweltaspekte

    District heating projects typically fall under Annex II of the Environmental Impact Assessment (EIA) Directive, leaving it to the national competent authority to determine whether an environmental impact assessment is required according to criteria defined in Annex III of the directive. The project schemes in integrated water services and waste collection are not likely to have a significant environmental and social impact and none of them are expected to require EIA. During appraisal, the promoter's environmental, health and safety procedures will be assessed to determine that they are acceptable and in line with Bank environmental and social (E&S) requirements.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project shall be tendered in accordance with the relevant applicable EU procurement legislation, (i.e. Directive 2004/17/EC and Directive 2004/18/EC where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 21/11/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Energie Müllbeseitigung Wasser, Abwasser