Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20160227
    Veröffentlichungsdatum: 21 Juni 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    TAMPEREEN KAUPUNKI

    Ort

    Beschreibung

    Construction of the first tramway line in the city of Tampere

    Ziele

    The project consists of the first tramway line in Tampere, the third-largest city in Finland with more than 200,000 inhabitants. The 23.5 km route will link the city centre with Sampola, where branches would continue to the University Hospital of Tampere and Hervanta.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 165 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 330 million

    Umweltaspekte

    The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive. Compliance with the EIA Directive, as well as with other relevant directives (i.e. Habitats and Birds) will be checked during appraisal.
    Overall, the project can be expected to contribute to an improvement of the urban environment thanks to lower noise and pollutant emissions by tram vehicles compared to the current buses, and by contributing to the promotion of public transport, reducing individual car use.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required. The tender for the design and construction works was published in the OJEU on 3 December 2014 (2014/S 233-411156) and the award notice (2015/S 177-320177) was published on 12 September 2015. For the rolling stock acquisition a negotiated procedure (2016/S 066-116079) was published on 5 April 2016.

    Projektstatus

    Unterzeichnet - 30/09/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Finnland Verkehr