    Referenz: 20160169
    Veröffentlichungsdatum: 16 November 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    IBERDROLA SA

    Ort

    Beschreibung

    Financing for the development and modernisation of electricity network infrastructure throughout Spain during the 2016-2018 period.

    Ziele

    The overall purpose of the programme is to modernise the electricity distribution network in order to maintain or improve the quality of electricity supply, cater for new system users and improve the overall operational efficiency of the distribution system operator. It also comprises advanced metering infrastructures, as per the country's mandatory roll-out.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 500 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1197 million

    Umweltaspekte

    The project will concern the implementation of electricity distribution schemes and comprises overhead lines with voltage levels up to 132 kV, some of which may require the competent national authority to determine the need for an environmental impact assessment (EIA). The main impacts that can be typically expected for the programme relate to noise nuisance and disturbance during construction, vegetation clearance, visual impact, electromagnetic fields as well as impact on flying vertebrates.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    Unterzeichnet - 23/12/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Spanien Energie