Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20160164
    Veröffentlichungsdatum: 3 Oktober 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    ACCEPTABLE CORPORATE(S)

    Ort

    Beschreibung

    Programme loan financing the regional water operating companies' (ROCs) contribution during the 2014-2020 programming period to the investment programmes funded by the Operational Programme Large Infrastructure

    Ziele

    This operation will support the implementation of the priority projects in the water sector in Romania and is notably expected to contribute to further improving Romania's compliance with the EU Drinking Water and Urban Waste Water Treatment Directives.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 39 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1000 million

    Umweltaspekte

    The projects are expected to contribute to the protection of water bodies by implementing the EU Directive for Urban Waste Water Treatment and by ensuring an efficient and sustainable use of water resources thanks to a reduction of technical water losses and water demand. The Bank will require the promoter to respect the provisions of the relevant EU directives, including the Strategic Environmental Assessment (SEA), Environmental Impact Assessment (EIA), Habitats and Birds Directives, as transposed into national law.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Genehmigt - 13/12/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Rumänien Wasser, Abwasser