Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20160038
    Veröffentlichungsdatum: 7 September 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    undisclosed

    Ort

    Beschreibung

    Investments in energy-efficient modernisation of residential housing and the construction of near-zero energy buildings (NZEB)

    Ziele

    This operation supports regional, national and European objectives related to improving energy efficiency and increasing renewable energy generation in the housing sector.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 230 million

    Umweltaspekte

    This operation intends to bring environmental benefits by supporting schemes that reduce energy consumption, increase the use of renewable energies and thus help to mitigate climate change. The individual schemes to be financed are likely to be small and are expected to have a very limited negative environmental impact. The cumulated impact of sub-projects could instead generate important environmental benefits. Given the scale, location and nature of the individual schemes in built-up urban areas, an environmental impact assessment (EIA), as defined in the EIA Directive 2011/92/EU, is not required. The Bank will assess the promoter's capacity and procedures to ensure compliance with national and European environmental and biodiversity regulations as well as its capacity to support the Bank's public disclosure policy, which aims to facilitate access by the public to environmentally relevant information.

    Auftragsvergabe

    The promoter has been assessed by the Bank as being a private company not operating in the utilities sector and not having the status of a contracting entity, thus not subject to EU rules on public procurement. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the EIB Guide to Procurement or, if applicable, relevant applicable EU procurement legislation (Directive 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 16/12/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Deutschland Stadtentwicklung Energie Dienstleistungen Industrie