Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20150712
    Veröffentlichungsdatum: 23 November 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    COUNTERPART(S) TO BE DETERMINED

    Ort

    Beschreibung

    Structural programme loan to co-finance transport investments under the Large Infrastructure Operational Programme 2014-2020 in Romania

    Ziele

    The project is a structural programme loan (SPL) for Romania covering the transport components of the Large Infrastructure Operational Programme (LIOP) 2014-2020.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 1000 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 6800 million

    Umweltaspekte

    A strategic environmental assessment (SEA) is required for all operational programmes co-financed with EU funds. Compliance with the SEA Directive (2001/42/EC) will be assessed for the transport components of LIOP 2014-2020. The environmental impact and compliance of each project with the Environmental Impact Assessment (EIA) Directive 2014/52/EU, Habitats Directive 92/43/EEC, Birds Directive 2009/147/EC and others, will be assessed in accordance with the procedures to be adopted for the SPL. The Bank requires the promoter to act according to the provisions of the aforementioned directives as transposed into national law.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation: Directives 2014/24/EU and 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 21/07/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Rumänien Verkehr