    Referenz: 20150580
    Veröffentlichungsdatum: 8 Januar 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    SSE PLC

    Ort

    Beschreibung

    The project covers the promoter's investments to create additional power transmission capacity in Scotland. It comprises about 180 km of underground and subsea cable, 2 AC/DC converter stations, and the construction or reinforcement of 8 substations and 2 power transmission lines, in north-eastern Scotland.

    Ziele

    This reinforcement of transmission infrastructure in the area will allow the interconnection of up to 1,200 MW of additional generation from renewable sources (primarily wind).

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 671 million (GBP 500 million)

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1559 million (GBP 1162 million)

    Umweltaspekte

    The project concerns activities some of which fall under Annex I and others under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU). Construction of a 275 kV overhead line, subsea cables and converter stations have all been found to require an EIA, while other sub-projects have been screened out by the authorities due to their limited scope and impact.
    It is not foreseen that there will be any significant adverse impact on any European conservation site (e.g. Natura 2000, Habitats or Birds Directives sites) in the project area. The typical potential impact during construction would be noise, dust, vibration, traffic disruption, and impact on sea floor, water quality, birds, fish and marine mammal populations.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 29/03/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).