Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20150447
Veröffentlichungsdatum: 28 August 2015

Projektträger – zwischengeschaltetes Finanzinstitut

NOVAMONT SPA

Ort

Beschreibung

Financing of investments for the development of an integrated supply chain in the field of biochemicals and bioplastics.

Ziele

The project concerns the deployment of innovative process technologies for the production of bioplastics and bio-chemicals that are expected to be used for a number of industrial (e.g. plasticisers, biodegradable lubricant oils for industry and vehicles) and consumer goods (e.g. renewable and biodegradable base for cosmetics, carrier bags, films and packaging) applications.

Sektor(en)

  • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 30 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 105 million

Umweltaspekte

The project includes investment in research and development (R&D) that are expected to be carried out in existing facilities already authorised for the same purpose and that would therefore not require an environmental impact assessment (EIA) under Directive 2011/92/EU (amended 2014/52/EU). However, the project will also include other types of investments such as capacity expansion through installation of new production lines in existing chemical plants and associated upstream and downstream activities which may fall under the EIA Directive and Industrial Emissions Directive (2010/75 EC). This as well as any other environmental aspects will be verified during the project appraisal.

Auftragsvergabe

The promoter has been assessed by the EIB as being a private company not operating in the utilities sector and not having a status of a contracting entity, thus not subject to EU rules on public procurement. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the promoter to ensure that the project will follow the relevant applicable EU procurement legislation.

Projektstatus

Unterzeichnet - 18/12/2015

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Industrie