    Referenz: 20150217
    Veröffentlichungsdatum: 10 Oktober 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    PUBLIC ENTITY(IES)

    Ort

    Beschreibung

    The project will focus on the Greater Suva Area (GSA) on Fiji's main island, Viti Levu in the South Pacific. The project comprises the construction of a new water-treatment plant, upgrade of an existing wastewater treatment plant, upgrade and extension of water distribution and wastewater collection networks, and all related works. Technical assistance will be provided to strengthen project implementation capabilities.

    Ziele

    The project will benefit the 224,000 inhabitants in the GSA service area of the Water Authority of Fiji, and will provide them with improved water and sewerage services. The project would bring about a number of important health and environmental improvements, particularly for the growing population in the peri-urban that are as yet unserved.

    Kommentar(e)

    The total project cost is indicative.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    USD 75 million

    Gesamtkosten (voraussichtlicher Betrag)

    USD 345 million

    Umweltaspekte

    An environmental and social assessment is being carried out as part of the ongoing technical assistance project preparatory work. Where required, a full environmental impact assessment (EIA) will be carried out taking into account the relevant EU environmental and social principles, standards and practices. An environmental and social management plan (ESMP) will be required to operationalise environmental and social impact mitigation measures. Details will be assessed during appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 10/11/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Fidschi Wasser, Abwasser