    Referenz: 20140397
    Veröffentlichungsdatum: 3 März 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    Megalis Bretagne

    Ort

    Beschreibung

    The project relates to the design and roll-out of a publicly owned passive fibre broadband network PIN (Public initiative network) in Bretagne.

    Ziele

    The objective of the project is to deploy a fibre to the home (FTTH) network in areas not covered by commercial operators as well as to upgrade around nodes to improve download speeds for existing ADSL/VDSL lines. The provision of FTTH connectivity to public sites is also included in the project

    Kommentar(e)

    This project would be eligible under the "Programme France Très Haut Débit" and the funds would be provided through intermediary banks participating in this programme.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 210 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 423 million

    Umweltaspekte

    Investments in fixed telecommunications projects (mainly civil works for fibre rollout) do not fall under the Environmental Impact Assessment (EIA) Directive 2011/92/EC. The related works have limited environmental effects, apart from disturbance during civil work constructions, which can be mitigated by appropriate measures. Full environmental details will be assessed during appraisal, including the possible impact on protected flora and fauna (Habitats Directive 92/43/EC and Birds Directive 79/409/EC).

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC as well as Directive 2007/66/EC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Genehmigt - 15/04/2015

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Frankreich Telekommunikation