Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20120256
Veröffentlichungsdatum: 15 März 2016

Projektträger – zwischengeschaltetes Finanzinstitut

MERSEYTRAVEL

Ort

Beschreibung

The project consists of the acquisition of electrically powered rolling stock for use on Merseytravel's network in Merseyside, Cheshire and West Lancashire in the northwest of England together with associated upgrades to the railway's infrastructure and maintenance depots.

Ziele

Merseytravel wishes to procure a new fleet which will be in service by the early 2020s. The project will contribute to the continuation, improvement and development of reliable high quality public transport services in Merseyside, Cheshire and West Lancashire and encourage modal shift away from road transport promoting time, vehicle operating cost and safety benefits.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 245 million (GBP 190 million)

Gesamtkosten (voraussichtlicher Betrag)

EUR 516 million (GBP 400 million)

Umweltaspekte

Manufacture of rail rolling stock doesn't fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU. Compliance with EU legislation and the environmental impact of the project will be examined during the project appraisal. The project helps to reduce reliance on private cars and the negative impact of transport on the environment, thus contributing to climate change objectives.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (in this case Directive 2004/18/EC and Directive 2007/66/EC (amending Directives 1989/665/EEC and 1992/13/EEC)), with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 29/12/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Verkehr