Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20120256
    Veröffentlichungsdatum: 15 März 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    MERSEYTRAVEL

    Ort

    Beschreibung

    The project consists of the acquisition of electrically powered rolling stock for use on Merseytravel's network in Merseyside, Cheshire and West Lancashire in the northwest of England together with associated upgrades to the railway's infrastructure and maintenance depots.

    Ziele

    Merseytravel wishes to procure a new fleet which will be in service by the early 2020s. The project will contribute to the continuation, improvement and development of reliable high quality public transport services in Merseyside, Cheshire and West Lancashire and encourage modal shift away from road transport promoting time, vehicle operating cost and safety benefits.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 245 million (GBP 190 million)

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 516 million (GBP 400 million)

    Umweltaspekte

    Manufacture of rail rolling stock doesn't fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU. Compliance with EU legislation and the environmental impact of the project will be examined during the project appraisal. The project helps to reduce reliance on private cars and the negative impact of transport on the environment, thus contributing to climate change objectives.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (in this case Directive 2004/18/EC and Directive 2007/66/EC (amending Directives 1989/665/EEC and 1992/13/EEC)), with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 29/12/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Verkehr