Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20120101
Veröffentlichungsdatum: 11 April 2012

Projektträger – zwischengeschaltetes Finanzinstitut

The project promoter will be Peel Ports Ltd, the parent company of the Mersey Docks and Harbour Company, which owns and operates the dock facilities of the Port of Liverpool. Peel Ports, is the UK’s second largest ports group.

Ort

Beschreibung

The project consists of the construction of an in-river container terminal to handle post panamax ships.

Ziele

The project to enhance the capability of this category A TEN-T port will support maritime and inland transport as an alternative to other modes and will thus contribute to transport sustainability.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 180 million (GBP 150 million)

Gesamtkosten (voraussichtlicher Betrag)

EUR 365 million (GBP 305 million)

Umweltaspekte

The project falls under Annex I of the EIA Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC. A full EIA has been undertaken for the project, including environmental impact studies (EIS) and a public inquiry. The EIS non technical summary (NTS) has been provided to the Bank. The consent for port development, the Harbour Revision Order, was issued in May 2007. The Bank will review the EIA process, compliance with the SEA directive, biodiversity assessment requirements, residual impacts of the project, as well as environmental mitigation and monitoring during appraisal.

Auftragsvergabe

Mersey Docks and Harbour Company is a contracting entity falling under the scope of the Directive 2004/17/EC of 31 March 2004. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EEC and Dir. 2007/66/EC), with parallel publication of tender notices in the EU Official Journal, as and where appropriate. Procurement procedures and status for the various project components will be checked during appraisal.

Projektstatus

Unterzeichnet - 21/12/2012

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Verkehr