Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090369
    Veröffentlichungsdatum: 1 Februar 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    Generalitat de Catalunya

    Ort

    Beschreibung

    The project consists of two schemes for the extensions of the FGC Barcelona-Vallès suburban railway lines in the cities of Terrassa and Sabadell.

    Ziele

    The Project is mainly an infrastructure extension of the existing suburban train network in the Barcelona metropolitan area and will be highly integrated with its public transport services. It will foster urban mobility and improve the attractiveness of public transport, thereby contributing to alleviate present and future traffic constraints and, consequently, to enhance the quality of the urban environment.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Indicatively, up to EUR 300 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Indicatively, around EUR 750 million.

    Umweltaspekte

    The project is part of the Directive Plan of Infrastructures 2001-2010 (PDI) of the Authority of the Metropolitan Transport (ATM) of Barcelona. The project falls under Annex II of EIA Directive and, following the corresponding requests by the environmental authority, all environmental impact processes judged necessary have been successfully completed between 2003 and 2007. This will be further analysed during appraisal.

    Auftragsvergabe

    The Promoter is subject to and follows EU procurement procedures, including publication in the EU Official Journal. According to the received information, all tendered contracts are in compliance with the EU Directives on procurement and the procedures adopted for the project are suitable and acceptable to the Bank.

    Projektstatus

    Unterzeichnet - 30/06/2010

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Spanien Verkehr