Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20070168
Veröffentlichungsdatum: 5 Dezember 2007

Projektträger – zwischengeschaltetes Finanzinstitut

Ministry of Transport and Communication of the Federation of Bosnia and Herzegovina.

Ort

Beschreibung

The project concerns a new motorway section adjacent to those already under preparation or construction, namely Zenica South - Kakanj, in a length of about 15 km.

Ziele

The project will significantly increase accessibility and reduce travel times, thereby contributing to a balanced economic development of the regions concerned. Current average speeds on existing road are estimated at some 50 km/h and these should rise to 120 km/h with the new infrastructure. Commuting among main cities and towns along the corridor will be much faster and more comfortable.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 75 million.

Gesamtkosten (voraussichtlicher Betrag)

About EUR 158 million.

Umweltaspekte

This type of project (construction of a motorway) falls under Annex I of EU Directive 85/337/EEC as amended by Directive 97/11/EC and thus requires a full EIA.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement and applicable EU rules.

Projektstatus

Unterzeichnet - 18/12/2008

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Bosnien und Herzegowina Verkehr