Veröffentlichungsdatum: 14 Oktober 2005
Projektträger – zwischengeschaltetes Finanzinstitut
Romania, acting through the Ministry of Public Finance.Ort
Beschreibung
The project consists of the restoration of roads and waterways damaged in the floods of 2004, affecting seventeen counties in Northern Romania, and works to prevent the recurrence of similar events.
Ziele
Re-establishing normal economic activity as soon as possible. Reconstruction and preventive works will contribute to the reduction of risk from future re-occurrence of similar problems.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 261 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 526 million.
Umweltaspekte
Schemes are mainly small and mainly replacement of existing infrastrucuture and therefore have little or no new impact on the environment. All schemes will have to take into account the requirements of the Law on Environmental protection 137/1995, which is in line with EU requirements.
Auftragsvergabe
The Ministries of Finance and of Transport are accustomed to and use the standard Bank requirements.
Projektstatus
Unterzeichnet - 27/12/2005
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).