Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20040217
    Veröffentlichungsdatum: 28 April 2005

    Projektträger – zwischengeschaltetes Finanzinstitut

    Finnish Road Administration (Finnra)

    Ort

    Beschreibung

    The construction and operation of a 50 km section of the E18 motorway between Muurla and Lohja, including seven tunnels, eight interchanges and forty-nine bridge sites.

    Ziele

    The new motorway section will complete the missing link between Turku and Helsinki, thus improving the transport efficiency, safety conditions, and environment protection and savings in travel time for local, as well as for international transit traffic, along the E18.

    Kommentar(e)

    Road Transports.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 200 million. To be reviewed once the preferred bidder has been appointed. The Bank’s loan would not exceed the usual limits in relation to project cost for this type of project.

    Gesamtkosten (voraussichtlicher Betrag)

    The capital cost is currently estimated to be approximately EUR 360 million, but will be finalized once the preferred bidder has been appointed.

    Umweltaspekte

    The project falls within the scope of Annex 1 of the EC Directive 97/11, requiring a full EIA with public consultation, which has already been undertaken.

    Auftragsvergabe

    The project will be procured as a Public Private Partnership to design, build, finance and maintain the infrastructure. The payment mechanism will be based on availability and performance payments to the concession company during a 25-year concession. The procurement procedure applied by Finnra is based on Finnish national laws (1505/1992 and 380/1998), which are in accordance with EU Directives. The project was advertised in the Public Procurement Gazette on 11 March 2004, issue 11.2004, and in the Official Journal of the EU, issue S47/2004.

    Projektstatus

    Unterzeichnet - 27/10/2005

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Finnland Verkehr