Veröffentlichungsdatum: 17 August 2004
Projektträger – zwischengeschaltetes Finanzinstitut
St. Vincent Electricity Services Ltd.Beschreibung
The project concerns the development and construction of a new diesel power plant (Lowman’s Bay) to gradually replace the existing main generating site at Cane Hall, and the adjustment of the island’s transmission & distribution network to the new alternative site for power generation.
Ziele
Construction of a new power plant and related infrastructure.
Kommentar(e)
Electricity Production.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to USD 10 million equivalent to EUR 8.3 million at the current exchange rate
Gesamtkosten (voraussichtlicher Betrag)
EUR 28.1 m.
Umweltaspekte
Within the EU, the project would fall under Annex II of Directive 97/11/EC, for which the decision to require an EIA would depend on the member state. In this case, although not formally required by national legislation, the promoter has carried out environmental impact studies (marine and terrestrial) with public consultation to assess the effects of the project. The studies conclude that air pollutant emissions will meet European ambient air quality standards and the impacts on marine communities will be negligible.
Auftragsvergabe
The power plant will be procured on a turnkey-basis following the procedures of international tendering including publication in the OJEU according to the Bank’s Guide to Procurement.
Projektstatus
Unterzeichnet - 8/12/2004