Veröffentlichungsdatum: 27 November 2002
Projektträger – zwischengeschaltetes Finanzinstitut
Przedsiebiorstwo Panstwowe “Porty Lotnicze” (PPL), or “Polish Airports” State Enterprise.Ort
Beschreibung
Construction of a second terminal at Warsaw International Airport.
Ziele
The project will enable the airport to accommodate existing and rapidly rising demand for air transport in Poland, and will contribute to Poland's integration into the EU, and to strengthening transport links between the EU and Poland.
Kommentar(e)
Air transport
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 200 million
Umweltaspekte
An independent Environmental Impact Study (EIS) has been undertaken based upon outline plans. The project will comply with the Polish Environmental Protection Act of 27 April 2001 and a full EIA, compliant with both Polish and EU legislation, will be completed at detailed design stage.
Auftragsvergabe
The procurement process for the design and build contract comprised an open international tender competition between pre-qualified consortia, following advertisement in OJEC.
Projektstatus
Unterzeichnet - 19/12/2002
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).