Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    170.000.000 €
    Länder
    Sektor(en)
    Marokko : 170.000.000 €
    Energie : 170.000.000 €
    Unterzeichnungsdatum
    22/05/2025 : 170.000.000 €

    Übersicht

    Veröffentlichungsdatum
    21 Mai 2024
    Projektstatus
    Referenz
    Unterzeichnet | 22/05/2025
    20230866
    Projekttitel
    Projektträger – Finanzintermediär
    ONEE - TRANSMISSION ENERGIE RENOUVELABLE
    OFFICE NATIONAL DE L'ELECTRICITE ET DE L'EAU POTABLE
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 170 million
    EUR 355 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project consists of a multi component investment programme covering the period 2024-2029, that includes several electricity transmission schemes, from 60 kV to 400 kV, geographically dispersed throughout the country.

    The aim is to reinforce and extend the country's electricity infrastructure (transmission lines and substations) by reducing losses, enhancing reliability and meeting new electricity demand. Additionally, the programme includes the integration of new renewable electricity generation capacity that will ensure a more sustainable and efficient power system.

    Zusätzlichkeit und Wirkung

    The Project is a multi-component, multi-annual investment programme aimed at reinforcing and extending the electricity transmission network of Morocco and at integrating the additional renewable energy production.


    The financing is strongly aligned with Morocco national targets for decarbonisation in the context of the Intended Nationally Determined Contributions of the country. The Project will contribute to EU policy objectives of sustainable energy infrastructure and combating climate change. It will be contributing to the following Sustainable Development Goals: SDG 1 (no poverty), SDG 7 (access to affordable, reliable and sustainable energy), in particular sub goal 7.2 (increase the share of renewable energy in the global energy mix), SDG 8 on inclusive and sustainable economic growth, SDG 13 (combat climate change), and SDG 17 (partnerships for the goals).


    This operation is in line with EU priorities for Morocco and eligible under NDICI, as it contributes to climate change mitigation as well as to the development of social and economic infrastructure, specifically energy, the energy sector being one of EU's top priorities in the Southern Neighbourhood as defined notably in the EU-Morocco Green Partnership.


    The Project will address several market failures. Individually, each sub-project addresses negative climate and environmental externalities through the reduction of carbon emissions and air pollution and the market failure associated with security of supply, which has dimensions of public good.


    The Project will facilitate the development and/or expansion of regional economy. The economic rate of return and broader social benefits are expected to be respectively good and excellent for the sub-projects. The Project is supported by adequate governance and capabilities of the Promoter.


    Finally, EIB's financial and non-financial contribution is excellent. The Bank is cooperating closely with KfW under Mutual Reliance Initiative (MRI) for Project due diligence and monitoring optimising project implementation for the Promoter. EIB will be the leading financing institution under the MRI with KfW. The loan has distinctive features such as long maturity and grace period which are not traditionally available on the market. The EIB provided an excellent level of technical support contributing to the improved structure of the Project and its components. Technical assistance was also provided on different aspects of the Project (notably E&S), enhancing its overall structure and its components. 


    Umweltaspekte
    Auftragsvergabe

    The envisaged sub-projects (new transmission lines and substations from 60 kV to 400 kV) are expected to require a full Environmental and Social Impact Assessment (ESIA) study in accordance with national law. The exact requirements and status of the permitting procedures will also be further assessed during the appraisal. The promoter shall comply with EIB's Environmental and Social standards.

    The promoter has to ensure that the project implementation will be done in accordance with the EIB's Guide to Procurement.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Phase
    In Prüfung
    Genehmigt
    Unterzeichnet
    30 April 2025
    22 Mai 2025

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - ONEE - TRANSMISSION ENERGIE RENOUVELABLE
    Datum der Veröffentlichung
    15 May 2025
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    243233064
    Thema
    Umweltinformationen
    Projektnummer
    20230866
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen