Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    30.380.000 €
    Länder
    Sektor(en)
    Kroatien : 30.380.000 €
    Energie : 30.380.000 €
    Unterzeichnungsdatum
    11/10/2024 : 30.380.000 €

    Übersicht

    Veröffentlichungsdatum
    17 Oktober 2024
    Projektstatus
    Referenz
    Unterzeichnet | 11/10/2024
    20200903
    Projekttitel
    Projektträger – Finanzintermediär
    KIEPACH GO GREEN ENERGY INFRASTRUCTURE EXPANSION
    HRVATSKA ELEKTROPRIVREDA DD
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 30 million
    EUR 92 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project will finance the construction and operation of one solar photovoltaic plant (PV) (~99 MWp).

    The aim is to produce electricity from low carbon sources, reduce carbon emissions and air pollution (compared to fossil-fuel generation). By addressing the market failure of negative climate and environmental externalities, the project supports the EU and national renewable energy generation targets, REPowerEU Action Plan as well as the EIB's Climate Action and renewable energy objectives.

    Zusätzlichkeit und Wirkung

    The solar PV Project will support the 2030 targets set out in the National Energy and Climate Plan of Croatia and the REPowerEU Action Plan.

    The financing of this Project contributes to Bank's lending priority objectives on Decarbonising the Energy Supply (RES), as well as on Climate Action and Economic and Social Cohesion.

    In terms of addressing market failures, the solar PV Project produces electricity from low carbon sources and thereby helps to address the market failure of negative environmental externalities, through the reduction of carbon and air pollution.

    The Project is expected to rely on sales on the day-ahead market, or commercial power purchase agreements. Thereby the Project improves market efficiency and competition. 

    On project quality, the Project is supported by adequate capabilities / governance of the Promoter. In terms of project results, it is expected to have a positive economic rate of return, considering the economic value of the electricity generated. Therefore, the Project is expected to generate a positive broader social benefit by generating clean and renewable power at a cost (LCOE) reasonably below the cost alternatives in Croatia.

    The EIB's financial contribution stems from the Bank's capacity to provide long-term financing at favourable conditions which is substantially aligned with the long economic life of the assets to be financed.

    Umweltaspekte
    Auftragsvergabe

    The solar PV including its ancillary facilities falls under Annex II of the Environmental Impact Assessment (EIA) EU Directive 2011/92/EU, as amended by Directive 2014/52/EU, requiring the competent authorities to determine whether an EIA is required. Competent authorities (Ministry of Environmental Protection and Energy), in Croatia, in October 2019, screened the project out from the requirement to carry out an EIA process.

    The Promoter is a public entity operating in the utility sector and the Bank would normally require the contracts of the Project to be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. However, as this Project will be co-financed (by more than 50%) by EBRD, the Directive 2014/25/EU shall not apply to the contracts under this Project as per the Article 20.2 of the Directive. EBRD and EIB agree that the Promoter will implement the Project in accordance with the procurement rules and procedures of the EBRD.

    Phase
    In Prüfung
    Genehmigt
    Unterzeichnet
    10 September 2024
    11 Oktober 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - KIEPACH GO GREEN ENERGY INFRASTRUCTURE EXPANSION
    Datum der Veröffentlichung
    20 Nov 2024
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    191564990
    Thema
    Umweltinformationen
    Projektnummer
    20200903
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen