Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
1.200.000.000 €
Länder
Sektor(en)
Italien : 1.200.000.000 €
Verkehr : 1.200.000.000 €
Unterzeichnungsdatum
18/06/2024 : 400.000.000 €
14/02/2024 : 800.000.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
26 Februar 2024
Projektstatus
Referenz
Unterzeichnet | 14/02/2024
20220729
Projekttitel
Projektträger – Finanzintermediär
IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK
AUTOSTRADE PER L'ITALIA SPA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 1200 million
EUR 2921 million
Ort
Sektor(en)
Beschreibung
Ziele

The investment programme concerns the modernisation and upgrade of the highway network operated and managed by ASPI, covering a total length of 2,855 km. In particular, it includes the following works: - Seismic upgrading and structural reinforcement of 40 bridges and viaducts (in line with the EU and national standards post Morandi bridge collapse), including the demolition/reconstruction, reinforcement of deck and substructure as well as renewal of crash barriers on bridges and viaducts in line with the EU Standard EN 1317; - Replacement of crash safety and noise barriers, including more than 66,700 linear metres of safety barriers and the installation of more than 85,000 linear metres of new noise barriers; - Alignment of 87 existing tunnel tubes in terms of structural reinforcement (IRS) and renewal interventions (TRS); - Smart and Intelligent Roads; - Modernisation of ASPI's installation, including works to reduce CO2 emissions (energy-efficiency renovation of buildings, replacement of lighting with LED) and upgrade of Intelligent Transport Systems (ITS) to optimise traffic flow and safety; - Modernisation of ASPI's IT infrastructure, including the installation of 871 linear kilometres of fiber optic; - Installation of 98 e-vehicle charging stations across ASPI's highway network including at least 2 ultra-fast DC charging units of 300 kW.

The main objectives are to safeguard and upgrade the assets, to improve road safety, to reduce pollution, notably noise as well as develop ITS services and electric recharging stations. The project is not expected to lead to any traffic capacity increase. Moreover, it is expected that no material interventions will occur beyond the existing right of way.

Additionality and Impact

The proposed operation aims at improving over 40% of the Italian motorway network, a key strategic infrastructure which is almost entirely on the core and comprehensive TEN-T. This network, operated by ASPI, requires to be modernised to meet the latest TEN-T regulations and Italian standards in terms of infrastructure safeguard and road safety on its entire length.

The Project focuses on the following main streams: (i) regulatory adaptation and rehabilitation of viaducts/bridges and tunnels, (ii) replacement of safety barriers, (iii) installation of anti-noise barriers, (iv) upgrade of optic fibre, installation of IT systems for security and network monitoring, lighting and security signage, and (v) installation of e-vehicle charging points.

The Project is expected to lead to a significant set of benefits, including maintenance savings, lower accident rates, abatement of noise pollution and CO2 emissions, and time saving for road users due to smart transport innovation. The project is not aimed at increasing capacity.

The Project is aligned with the EIB's Climate Bank Roadmap and with the provisions of the EIB's Transport Lending Policy on interurban roads.

EIB's technical contribution has been limited to better assess and report the sustainability elements of the project. By doing so, the Bank services have contributed to raise the awareness of the promoter to a more holistic approach to the planning and programming of road rehabilitation, going beyond the economic impact of the project by taking into account its climate, environmental and social aspects.

The EIB financing will stabilize ASPI's funding sources with a longer tenor than otherwise available in the market, with a final maturity date aligned to the concession expiry date in 2038. Moreover, the EIB support to ASPI is expected to mobilize additional financing which will further underpin ASPI's efforts in their capex plan implementation with a strong signal to other lenders and the market regarding the solidity and viability of ASPI's business model, also in light of the upcoming negotiations with the Grantor for the review of the 2025-2029 regulatory period.

Umweltaspekte
Auftragsvergabe

None of the project's components are included in the categories of works listed Annexes II, III and IV, as set out in Article 6(6) of the Italian Consolidated Environmental Law (Testo Unico Ambiente - TUA) D.Lgs 152/06 which transposes Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by 2014/52/EU and therefore are not subject to an EIA procedure. Some of the project components under the category of works "rehabilitation of bridges and viaducts" and "installation of noise barriers" were subject to appropriate assessments (Valutazione di Incidenza VincA) in accordance with article 6.3 of the Habitats directive 92/43/EEC and with the Italian national guidelines on appropriate assessment (2019) . The project contributes to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation, pollution prevention and control.

Today ASPI is a private listed company, belonging to the category of concessionaires which are not contracting authorities. Part of the investments included in the project has been/shall be directly awarded to ASPI's subsidiary companies without public procurement, which does not formally infringe EU legislation within limits. The new Public Contracts Code of Italy (art. 186.2) imposes the obligation for the holders of directly awarded motorway concessions to entrust a quota between 50% and 60% (depending on different criteria included in the Code) of the works, services and supply contracts via public procurement processes. The promoter has therefore been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
13 Dezember 2023
14 Februar 2024

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK
Datum der Veröffentlichung
26 Feb 2024
Sprache
Bereich
Finanzierung
Nummer des Dokuments
178268931
Thema
Umweltinformationen
Projektnummer
20220729
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen
Umwelt- und Sozialverträglichkeitsprüfung - IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK - RELAZIONE GENERALE - Viadotto Carafone
Datum der Veröffentlichung
28 Mar 2024
Sprache
Bereich
Finanzierung
Nummer des Dokuments
181946763
Thema
Umweltinformationen
Projektnummer
20220729
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen
Umwelt- und Sozialverträglichkeitsprüfung - IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK - RELAZIONE GENERALE - Ponte Enza
Datum der Veröffentlichung
28 Mar 2024
Sprache
Bereich
Finanzierung
Nummer des Dokuments
181929769
Thema
Umweltinformationen
Projektnummer
20220729
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Aktuelles und Storys

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdemechanismus

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

Weitere Veröffentlichungen