Link zum projekt
Datenblätter
Andere Links
Übersicht
Veröffentlichungsdatum
11 Februar 2002
Projektstatus
Referenz
Unterzeichnet | 31/10/2002
20010353
Projekttitel
Projektträger – Finanzintermediär
Tranvía de Tenerife
Metropolitana de Tenerife, S.A.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
Up to 50% of the total project cost
Around 240 millions EUR
Beschreibung
Ziele
Design and construction of the 17 km tramway between La Laguna and Santa Cruz de Tenerife.
The project will contribute to regional development by improving traffic conditions and the urban environment in Santa Cruz.
Umweltaspekte
Auftragsvergabe
The promoter is required to respect the norms imposed by the Directive 97/11/EC. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been defined as regards environmental protection.
The promoter is required to respect the European Union Directives as regards procurement procedures.
Kommentar(e)
Environment, Transport and Communication
Link zum projekt
Übersicht
Andere Links
Datenblätter
Zugehörige Pressemitteilungen
Aktuelles und Storys
Link zum projekt
Andere Links