Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20250435
Veröffentlichungsdatum: 27 Oktober 2025

Projektträger – zwischengeschaltetes Finanzinstitut

SUEZ SA

Ort

Beschreibung

The project will finance the promoter’s investments in water and wastewater infrastructure, as well as digitalisation initiatives, across France during the period 2025–2027.

Ziele

The aim is to ensure continued compliance with relevant European Union directives, while also improving efficiency and advancing digitalisation within the promoter’s services.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 500 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 1060 million

Umweltaspekte

The project will comply with the Urban Wastewater Treatment Directive (2024/271/EU), the Drinking Water Directive (2020/2184/EU), and the Water Framework Directive (2000/60/EC). Some schemes included in the project fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by the EIA Directive 2014/52/EU). EIA procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate. According to the promoter, all relevant assessments have been carried out and approved by the relevant competent authority. Where and if applicable and based on a risk-based approach as defined in the EIB Group Environmental and Social Policy, the requirements of the EIA 2011/92/EU (as amended by Directive 2014/52/EU), Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal. The EIB's appraisal will focus on the Promoter's environmental management capacity to properly apply these EU Directives.

Auftragsvergabe

The promoter shall ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

In Prüfung - 22/09/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Frankreich Wasser, Abwasser