Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20250209
Veröffentlichungsdatum: 16 Dezember 2025

Projektträger – zwischengeschaltetes Finanzinstitut

VERKEHRSBETRIEBE HAMBURG-HOLSTEIN GMBH

Ort

Beschreibung

The project consists of (i) the reconstruction and expansion of the existing depot Schenefeld including instalment of charging equipment for electric vehicles, and (ii) the acquisition of 120 standard electric buses (12m length), 52 articulated electric buses (18m length) and 16 small electric buses (6.8m length).

Ziele

The project is expected to have a positive environmental impact and reduce greenhouse gas, as it will improve public transport services and therewith maintain or increase the modal share of public transport. Moreover, it is expected to improve the quality and attractiveness of public transport services which facilitate access to employment, education and urban services, and enhance an already affordable mobility solution.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 125 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 337 million

Umweltaspekte

The manufacturing of the new electric buses does not fall within the scope of Directive 2011/92/EU amended by the EIA Directive 2014/52/EU as it is not listed in the Annexes of the EIA Directive. Therefore, no environmental impact assessment (EIA) is required for rolling stock. Arrangements for the scrapping of the replaced rolling stock will be further assessed during appraisal. For the Depot works, based on a risk-based approach as defined in the EIB Group Environmental and Social Policy, the requirements of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal. The project is expected to have a positive environmental impact and reduce greenhouse gas (GHG) emissions because it will improve public transport services and therewith maintain or increase the modal share of public transport.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

In Prüfung - 13/06/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Deutschland Verkehr