Referenz: 20230869
Veröffentlichungsdatum: 25 Juni 2025

Projektträger – zwischengeschaltetes Finanzinstitut

COTE D'IVOIRE ENERGIES

Ort

Beschreibung

The project involves the construction of a 400 kV high-voltage transmission line spanning approximately 540 kilometres, connecting Abidjan (Anyama) to the East and North of Côte d'Ivoire. The new line will reinforce the regional interconnections to Burkina Faso and Mali. Additionally, the project will include a rural electrification scheme along the line.

Ziele

The aim is to contribute to a reliable, efficient, and climate-friendly energy supply in the eastern regions of Côte d'Ivoire. The project will also contribute to a more reliable and efficient Ivorian interconnected grid and energy exchange in the West African Power Pool (WAPP) as well as to the integration of renewable energies into the interconnected grid. This operation is in line with the country's new generation-transmission masterplan, contributing to the Nationally Determined Contributions (NDCs) to reduce carbon emissions by 30% and to achieve a 45% share of renewable energies in its energy mix until 2030.

Sektor(en)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 185 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 359 million

Umweltaspekte

The project's compliance with the applicable national environmental legislation and the EIB's environmental and social principles will be respected. The EIB will require the promoter to comply with the EIB Environmental and Social Standards.

Auftragsvergabe

As the promoter operates in the utilities sector as a public undertaking, public procurement procedures, as set in the EIB's Guide to Procurement, will apply. The promoter shall ensure that the implementation of the project will be done in accordance with the EIB's Guide to Procurement.

Projektstatus

In Prüfung - 27/02/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Côte d'Ivoire Energie