Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20010596
Veröffentlichungsdatum: 27 November 2002

Projektträger – zwischengeschaltetes Finanzinstitut

The National Roads Authority (NRA) through the Local Government and the Regions (Cork County Council).

Ort

Beschreibung

The project comprises the design, construction, operation and financing over a concession period of 30 years of approximately 17.5 km of dual two-lane motorway including associated interchanges, a 450 m motorway viaduct, two major river bridges, local road realignments and the tolling facilities associated with the project.

Ziele

The motorway will reduce the journey times of traffic travelling between Cork and Dublin. In particular it will bypass the communities of Fermoy and Rathcormac, reducing traffic congestion within the towns. Expected immediate benefits are: i) improvement of passenger and freight traffic flows, ii) reductions in travel time, and iii) reductions in vehicle operating costs. At the same time, traffic safety is expected to increase.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to 50% of the project cost or of the total senior debt

Gesamtkosten (voraussichtlicher Betrag)

Project cost will only be known when the preferred bidder has been appointed

Umweltaspekte

The alignment and preliminary designs have been the subject of an Environmental Impact Assessment and public discussion. The conclusions of this process are with the An Board Pleanala and a decision is awaited. The winning concessionaire will be responsible for designing, constructing and operating the project in accordance with the terms and conditions of this approval.

Auftragsvergabe

The project was advertised in the Official Journal of the EU in July 2001 in accordance with Directive 93/37/CEE. NRA received pre-qualification submissions from ten consortia, four of which were subsequently invited to submit preliminary proposals by December 2002. The NRA expects to choose a preferred bidder in July 2003.

Projektstatus

Unterzeichnet - 11/06/2004

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Irland Verkehr