Date de publication: 21 décembre 2005
Promoteur – Intermédiaire Financier
Council for Development and Reconstruction (CDR)Lieu
Description
The project covers selected wastewater related infrastructure works in the northern part of Greater Beirut. The main components are the construction of a wastewater treatment plant and preliminary treatment at Dora, rehabilitation or reconstruction of the existing sea outfall and construction of related main collectors, waste and storm-water networks and secondary lines.
Objectifs
The project allows for lowering risks to public health by improving the quality of water resources in the Greater Beirut area.The project falls within the remit of the Pollution Control Programme of the Lebanese coast, which was developed to allow Lebanon to comply with the objectives of the Barcelona Convention and the Genoa Declaration. It is therefore in full conformity with the objectives of the Euro-Mediterranean Partnership policy that were laid out for the Bank in this regard.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 60 million.
Coût total (montant approximatif)
EUR 155 million.
Aspects environnementaux
The environmental impact of the project will be very beneficial for the Mediterranean Sea, as the wastewaters of about 900 000 population equivalent will be properly treated before discharge into the sea.
Passation des marchés
In line with EIB procurement guidelines.
Statut
Signé - 28/12/2005
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).