    Übersicht

    Veröffentlichungsdatum
    10 Juni 2026
    Projektstatus
    Referenz
    In Prüfung | 08/05/2026
    20250695
    Projekttitel
    Projektträger – Finanzintermediär
    DANDARA SOLAR PV AND BESS
    SCATEC ASA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    not disclosed
    not disclosed
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project concerns the construction and operation of a 1.1 GWp solar photovoltaic (PV) plant with a co-located 50 MW/200 MWh battery energy storage system (BESS) located in Qena, Egypt.

    The aim is to increase the production and storage of electricity from low-carbon sources (solar PV) and to address negative climate and environmental externalities — a market failure — through the reduction of carbon dioxide emissions and air pollution. The project contributes to Egypt’s Vision 2030 and Integrated Sustainable Energy Strategy (ISES) 2035, supporting the country’s commitment to achieve 42% of electricity generation from renewable sources by 2030. Additionally, financing this project is in line with the EIB’s lending priority objectives on energy (renewable energy), as well as the transversal objectives on climate action (mitigation) and environmental sustainability (pollution prevention and control). The project is expected to rely on a long-term corporate power purchase agreement (PPA) with Misr Aluminium Company (EgyptAlum) as the offtaker.

    Umweltaspekte
    Auftragsvergabe

    The project is Categorised A in accordance with the EBRD Environment and Social Policy 2024 requiring the preparation of environmental and social impact assessment report including public consultation and stakeholder engagement. The ESIA package for phase 1, inclusive of Non-Technical Summary ("NTS"), Environmental and Social Action Plan (ESAP), Stakeholder Engagement Plan ("SEP") and Environmental and Social Management and Monitoring Plan ("ESMMP") have been disclosed on the EBRD and promoter's websites on March 4th 2026. Public consultation of the ESIA package with the surrounding communities took place in October 2025 and included a public hearing in Nagaa Hammadi. The results of the impact assessment indicate limited air emissions, minimal wastewater generation, and minor use of hazardous materials. Management plans will include dust control measures and waste handling procedures. Dry cleaning of PV panels will be used during operations to the extent possible, and specific actions regarding PV and BESS material sourcing, maintenance, and disposal will align with good international practices. There are no protected areas in the vicinity of the project area and no significant impact on biodiversity nor ecosystems has been identified in the ESIA. Extensive engagement with local authorities and adjacent communities has been undertaken by the promoter and a dedicated Community Liaison Officer will be hired before construction starts, responsible for the implementation of the SEP and management of external grievances throughout the lifetime of the Project. As the two phases are adjacent in a desert environment, E&S issues are unlikely to be materially different for the two phases. During appraisal, EBRD will assess compliance of Phase 2 with their Environmental and Social Requirements 2024.

    The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The project seems to be operating without exclusive or special rights, hence private sector procurement procedures should apply. This will be further assessed during appraisal.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Phase
    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen