Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    25.000.000 €
    Länder
    Sektor(en)
    Slowakei : 25.000.000 €
    Sanità : 1.000.000 €
    Trasporti : 3.750.000 €
    Istruzione : 6.000.000 €
    Sviluppo urbano : 14.250.000 €
    Unterzeichnungsdatum
    25/11/2025 : 1.000.000 €
    25/11/2025 : 3.750.000 €
    25/11/2025 : 6.000.000 €
    25/11/2025 : 14.250.000 €

    Übersicht

    Veröffentlichungsdatum
    28 August 2025
    Projektstatus
    Referenz
    Unterzeichnet | 25/11/2025
    20250256
    Projekttitel
    Projektträger – Finanzintermediär
    BRATISLAVA SUSTAINABLE REGIONAL DEVELOPMENT
    BRATISLAVSKY SAMOSPRAVNY KRAJ
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 25 million
    EUR 52 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project will finance the rehabilitation and energy efficiency improvements of public buildings (secondary schools, social services, health care), reconstruction of regional transport infrastructure (roads and bridges) and upgrading of urban greenery and parks in the Bratislava region.

    The investments supported by EIB contribute to reducing greenhouse gas emissions and enhancing quality of life in Bratislava region by improving energy efficiency performance of public buildings and modernising public infrastructure in education, health care, regional transport and green areas.

    Zusätzlichkeit und Wirkung

    The Project supports selected multi-sector investments of the Bratislava Region's Economic and Social Development Programme 2021-2027, which defines the strategic priorities for the Region's smart and sustainable growth.


    Delivered through a Framework Loan, the EIB's support will cover a broad range of investments including the rehabilitation of transport infrastructure (roads and bridges), as well as improvements of education, social and health care facilities, including energy efficiency renovations.


    The financing provided by the EIB will help the Region address its investment gap and is expected to generate positive direct and indirect benefits, such as better public services, better quality of enabling services for economic activities, as well as improvements of the urban and regional environment and social inclusion. The upgraded infrastructure will increase the attractiveness of urban areas as business locations, living spaces and tourist destinations and it is expected to have a positive effect on growth and job creation.


    The energy efficiency investments will directly result in positive environmental impact (reduction of greenhouse gas emissions) and a reduction of the Region's operating costs.


    The EIB Framework Loan is particularly advantageous for the Region, offering long term-flexible financing complemented by significant availability and grace periods, as well as disbursement terms tailored to the implementation timeline and the specific challenges of public infrastructure projects.


    Ultimately, the Project is expected to improve the quality of life of all residents while reducing inequalities between people and places.


    Umweltaspekte
    Auftragsvergabe

    The EIB allocates its funds exclusively to eligible projects that are environmentally sustainable. All projects shall comply with EU environmental legislation as well as with the principles and standards of the EIB Group Environmental and Social Policy. The project will contribute to climate action and environmental sustainability objectives. Where and if applicable, and based on a risk-based approach as defined in the EIB Group environmental and social policy, the requirements of the Environmental Impact Assessment Directive (EIA) 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive2009/147/EC, Habitats Directive 92/43/EEC and EU Directive on Energy Performance of Buildings will be checked during appraisal.

    The promoter shall ensure that contracts for the implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Phase
    In Prüfung
    Genehmigt
    Unterzeichnet
    19 November 2025
    25 November 2025

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - BRATISLAVA SUSTAINABLE REGIONAL DEVELOPMENT
    Datum der Veröffentlichung
    22 Nov 2025
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    251945680
    Thema
    Umweltinformationen
    Projektnummer
    20250256
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen