Übersicht

Veröffentlichungsdatum
11 November 2025
Projektstatus
Referenz
Unterzeichnet | 28/04/2026
20240770
Projekttitel
Projektträger – Finanzintermediär
GRAZ STRASSENBAHN BETRIEBSHOF SUED
HOLDING GRAZ - KOMMUNALE DIENSTLEISTUNGEN GMBH
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 230 million
EUR 473 million
Ort
Sektor(en)
Beschreibung
Ziele

The promoter operates under a public service agreement with the City of Graz, which was recently extended for an additional ten years, covering the period from 2025 to 2035.

The project will finance the purchase of up to 49 trams (approximately 34m long) and the extension of an existing tramway maintenance depot at Steyrergasse. It will also include a storage area at Auer Welsbach Gasse, adding capacity to accommodate additional 40 trams and expand the repair and maintenance workshop.

Zusätzlichkeit und Wirkung

The project supports the purchase of up to 49 trams (approx. 34m long) and associated infrastructure including the extension of an existing tramway maintenance depot at Steyrergasse as well as a storage area at Auer Welsbach Gasse.

The project is consistent with the Sustainable Urban Mobility Plan Graz 2040 which aim to reduce the modal share of cars by increasing the attractiveness of public transport. In doing so, the project complies with the objectives set in the EIB's Transport Lending Policy and is aligned with the Paris Agreement, according to Annex 2 of the EIB's Climate Bank Roadmap. The project also provides a substantial contribution to Climate Mitigation according to Annex 4 of the EIB's Climate Bank Roadmap and a substantial contribution to Environmental Sustainability.

There are no major negative social impacts, while the investments are expected to bring in a number of benefits including increased reliability of the tramway system while improving comfort and accessibility for tram passengers in Graz.

The Bank offers unique features rarely provided by other lenders, such as loan tranching and flexible disbursement terms to complement rigid public funding flows. Its extended availability period accommodates the Project's long implementation timeline and aligns with the economic life of financed assets. A stable fixed interest rate throughout the entire loan ensures predictability and matches the financing cost with the infrastructure's economic calculation period. Collectively, these elements help keep tariffs charged by the Promoter affordable.

Umweltaspekte
Auftragsvergabe

Manufacturing of vehicles does not fall within the scope of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU therefore no EIA is required for this component. Arrangements for the scrapping of the replaced rolling stock will be further assessed during appraisal. The extension of the depot is taking place on the existing footprint of the depot Steyrergasse, and the Competent Authority has issued a screening-out decision on March 2025 confirming that no EIA is required. The site is a registered contaminated site, and the Project includes removal of contaminated soil. The project is expected to have a positive environmental impact by helping the public transport to increase and or maintain modal share in. Furthermore, the Project should contribute to reducing the greenhouse gas emissions and noise.

The promoter shall ensure that contracts for the project implementation will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The tender for the trams was awarded to Alstom in May 2023. The main construction contracts for the depot are expected to be tendered by the end of 2026.

Phase
In Prüfung
Genehmigt
Unterzeichnet
13 Januar 2026
28 April 2026

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - GRAZ STRASSENBAHN BETRIEBSHOF SUED
Datum der Veröffentlichung
16 Jan 2026
Sprache
Bereich
Finanzierung
Nummer des Dokuments
256618204
Thema
Umweltinformationen
Projektnummer
20240770
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen