Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    150.462.962,98 €
    Länder
    Sektor(en)
    Polen : 150.462.962,98 €
    Stadtentwicklung : 150.462.962,98 €
    Unterzeichnungsdatum
    15/11/2024 : 150.462.962,98 €

    Übersicht

    Veröffentlichungsdatum
    22 Mai 2024
    Projektstatus
    Referenz
    Unterzeichnet | 15/11/2024
    20240285
    Projekttitel
    Projektträger – Finanzintermediär
    POZNAN MUNICIPAL INFRASTRUCTURE IV
    CITY OF POZNAN
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    PLN 669 million (EUR 154 million)
    PLN 1338 million (EUR 308 million)
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The Framework Loan (FL) will support eligible schemes under the multi-sector investment plan of the City of Poznan, as well as the urban development and climate adaptation strategy until 2030.

    The project covers new construction, refurbishment and upgrade of urban infrastructure, comprising, among others, public infrastructure (e.g. cultural, educational and sport facilities etc.), as well as sustainable mobility schemes (e.g. bicycle and pedestrian paths, public transport infrastructure and modernisation of urban roads, including road safety and climate measures). All schemes will be implemented within the City of Poznan boundaries.

    Zusätzlichkeit und Wirkung

    This project is structured as a Framework Loan (FL) to support the implementation of the multi-sector investment plan of the City of Poznan during the period 2024-2029, as well as the implementation of City's climate adaptation plan, urban development strategy until 2030 and its Sustainable Urban Mobility Plan (SUMP). 

    The project is aligned with the Bank's Urban Lending Review, Transport Lending Policy and the Energy Lending Policy. The investments will be complementary to the EU and national policies within the scope of EIB integrated territorial development primary objective and public policy goal.

    The project is aligned to the Climate Bank Roadmap (CBR), and its contribution to the Bank's Climate Action and Environmental Sustainability (CA&ES) objectives is estimated at approx. 34% of the total cost.

    This is the seventh direct operation with the City of Poznan acting as Borrower and the previous monitoring experience has been satisfactory.

    The project addresses a number of market failures and will bring important economic and social benefits, contributing to achieving a more integrated, sustainable, and inclusive development.

    The Bank's advice has contributed to the structuring of the operation to be better aligned to the goals of the EIB CBR and to maximize the project's contribution to the EIB CA&ES objectives.

    The EIB's advantageous financing conditions (such as: ticket size, grace and availability periods, financing term and disbursement flexibility) will contribute to improving the Poznan's debt repayment capacity and optimization of municipal resources. The EIB loan will be complimentary to own funds by the City while also allowing the City to effectively use available EU grants. 

    Umweltaspekte
    Auftragsvergabe

    The promoter is deemed to have adequate capacity to ensure compliance with the relevant EU legislation, mainly SEA Directive (2001/42/EC), environmental impact assessment (EIA) Directive (2011/92/EU, as amended by 2014/52/EU), Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC). Similarly, for new and refurbished buildings, the Promoter is deemed capable of ensuring compliance with EU Directive 2010/31/EU on Energy Performance of Buildings. The project is expected to contribute to the EIB's objectives linked to climate action and environmental sustainability (CA&ES).

    The promoter has to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Phase
    In Prüfung
    Genehmigt
    Unterzeichnet
    23 Oktober 2024
    15 November 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - POZNAN MUNICIPAL INFRASTRUCTURE IV
    Datum der Veröffentlichung
    25 Oct 2024
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    216880696
    Thema
    Umweltinformationen
    Projektnummer
    20240285
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen