Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    750.000.000 €
    Länder
    Sektor(en)
    Niederlande : 750.000.000 €
    Energie : 750.000.000 €
    Unterzeichnungsdatum
    26/02/2026 : 250.000.000 €
    11/03/2025 : 500.000.000 €

    Übersicht

    Veröffentlichungsdatum
    7 November 2025
    Projektstatus
    Referenz
    Unterzeichnet | 11/03/2025
    20240177
    Projekttitel
    Projektträger – Finanzintermediär
    STEDIN ELECTRICITY NETWORK UPGRADE AND EXPANSION
    STEDIN NETBEHEER BV
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 750 million
    EUR 1587 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The programme will support electricity distribution investments in the Netherlands, within the Promoter's service area, over the period 2025–2026. It will cover medium-voltage and low-voltage networks, as well as automation. The investment plan prioritises customer-driven measures, including new connections for renewable energy sources, electric vehicle charging infrastructure, and residential and commercial users. It also includes capacity-enhancing investments to expand the network and measures to maintain quality of supply through asset replacement and modernisation.

    The aim to modernise and expand the Promoter's electricity distribution network. It will support efficient network operation, facilitate the integration of renewable energy sources, enable the connection of new customers, and improve or maintain the quality of supply.

    Zusätzlichkeit und Wirkung

    The programme will cater for demand growth and improve the quality and reliability of electricity supply, it will contribute to the increase of RES connection capacity, as well as supporting the development of electro-mobility in the country. The investments will support the targets set in the country's National Energy & Climate Plan with regards to the integration of small-scale RES.


    The financing of this programme will contribute to the Bank's lending priority policy on Securing the enabling infrastructure (100%), and on Climate Action (100%). The programme is in line with the new Energy Lending Policy of the Bank under the theme securing the enabling infrastructure.


    The programme will contribute to addressing a number of market failures, allowing for the integration of renewable energy, which reduces negative climate and environmental externalities, and enabling increased electrification of the economy (transport, industry, etc.). The social benefit indicator is rated as Very Good.


    The Promoter has the necessary experience and capacity to manage the implementation of the programme and operate the assets over the term of the loan.

    Umweltaspekte
    Auftragsvergabe

    The investment programme comprises several electricity distribution schemes with voltages < 220 kV. Some of these schemes may fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. Where, and if applicable, the requirements of Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified during appraisal. The schemes related to automation are expected to have limited environmental impact. The environmental and social due diligence will follow the programme lending approach according to the EIB's procedures and standards. It will focus on the Promoter's capacity to implement the programme in line with the EIB environmental and social standards and requirements.

    The Promoter shall ensure that contracts for implementation of the project are tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Phase
    In Prüfung
    Genehmigt
    Unterzeichnet
    11 Dezember 2024
    11 März 2025
    Andere Links

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - STEDIN ELECTRICITY NETWORK UPGRADE AND EXPANSION
    Datum der Veröffentlichung
    11 Apr 2025
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    215660331
    Thema
    Umweltinformationen
    Projektnummer
    20240177
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Link zum projekt

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen