Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
500.000.000 €
Länder
Sektor(en)
Marokko : 500.000.000 €
Gesundheit : 70.000.000 €
Bildung : 200.000.000 €
Verkehr : 230.000.000 €
Unterzeichnungsdatum
1/10/2024 : 70.000.000 €
1/10/2024 : 200.000.000 €
1/10/2024 : 230.000.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
24 April 2024
Projektstatus
Referenz
Unterzeichnet | 01/10/2024
20230783
Projekttitel
Projektträger – Finanzintermediär
MOROCCO POST-EARTHQUAKE RECONSTRUCTION
ROYAUME DU MAROC
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 1000 million
EUR 1732 million
Ort
Sektor(en)
Beschreibung
Ziele

The loan will finance a number of multi-sector infrastructure projects under Morocco's post-earthquake reconstruction programme.

The objectives are: (i) to restore and improve the population living conditions; (ii) to strengthen resilience of cities to climate change and other natural disasters, by (re)constructing resilient and sustainable infrastructure.

Additionality and Impact

In September 2023, Morocco was struck by one of the most powerful earthquakes in its history. These areas faced specific geographic and development challenges, which made the reconstruction effort particularly important. The timely implementation of the reconstruction process post-disaster is paramount for reinstituting basic services and resuming economic activity in the affected areas. The Project will contribute, alongside national efforts and other partners, to financing multi-sector infrastructure components of Morocco's post-earthquake reconstruction programme through a sovereign loan to the Kingdom of Morocco. Specifically, the EIB loan will finance the rehabilitation of schools, roads, and hospitals in six affected provinces in the Atlas region.


The Project addresses the need for post-disaster re-establishment and subsequent reinforcement of the provision of public services in the area of education, health and transport, consistent with the role that major IFIs have on ensuring improved living conditions and standards, a safer and cleaner environment, and support to sustainable economic development. 


The reconstructed and newly build infrastructure will follow higher seismic standards than was required in the region before the earthquake and will be more energy efficient and resilient to climate change. Apart from the initial emergency measures, the construction of schools and health centres will include energy efficiency measures and the use of renewable energies and the road infrastructure will be designed taking into account climate adaptation and road safety considerations to withstand future natural disasters, ensuring long-term durability and safety.


The EIB's proposed financing complements the EU's intervention program for Morocco's reconstruction program. The Framework Loan is aligned with the multiple objectives of the EU's New Agenda for the Mediterranean, more specifically ecological transition (climate resilience), human development and migration and mobility. The Project is aligned with the country's priorities as it contributes to the financing of the national "Integrated programme for the reconstruction and comprehensive upgrade of the disaster areas".


The loan has distinctive features, including the ability to finance up to 100% of projects in post-disaster areas, a 30-year maturity, and a long grace period. Technical assistance was also provided, enhancing the project's overall structure and its components.

Umweltaspekte
Auftragsvergabe

A project with similar characteristics within the EU would be classified in Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU (amended by Directive 2014/52/EU), which would require a decision by the competent authority making an EIA mandatory or not. Education and health infrastructure as planned at this stage is not specifically mentioned in the EU EIA Directive and therefore EU Member States are not required to have one. However, the investments could be covered by Annex II of the EIA Directive if they are classified as urban development operations. The need for EIAs, particularly for roads, will be considered during appraisal.

The project promoters will have to ensure that all the related tendering processes will be done in accordance with the Bank's Guide to Procurement.

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Milestone
In Prüfung
Genehmigt
Unterzeichnet
17 Juli 2024
1 Oktober 2024
Link zum projekt

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - MOROCCO POST-EARTHQUAKE RECONSTRUCTION
Datum der Veröffentlichung
24 Jul 2024
Sprache
Bereich
Finanzierung
Nummer des Dokuments
188248928
Thema
Umweltinformationen
Projektnummer
20230783
Länder
Öffentlich zugänglich
Jetzt herunterladen

Aktuelles und Storys

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen