Veröffentlichungsdatum
25 September 2025
Projektstatus
Referenz
Genehmigt | 24/09/2025
20230776
Projekttitel
Projektträger – Finanzintermediär
BREAKWATER GENOA
AUTORITA DI SISTEMA PORTUALE DEL MAR LIGURE OCCIDENTALE
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 300 million
EUR 937 million
Ort
Sektor(en)
Beschreibung
Ziele

Major allocation under framework loan 2020-0263 to finance the expansion and redesign of the exterior breakwater at the Port of Genoa.

The project concerns the expansion and reconfiguration of the existing external breakwater ("Diga Foranea - Phase A"), located in the Port of Genoa, including the construction of new sections and the demolition of some existing ones. The project is expected to enhance the manoeuvrability and safety of seaside operations by providing a larger manoeuvring circle area and wider access channels.

Additionality and Impact

The Project supports the development of the Port of Genoa, a rail connected core TEN-T port located on the Mediterranean Corridor. The Project provides safe maritime access to port users, allows larger vessels to access the port and as such reduces costs of maritime transport. Consequently, the Project enhances the resilience and sustainability of the regional and European transport system, in line with EU objectives and the EIB Transport Lending Policy.


The Project addresses market failures related to underpriced transport externalities and provision of public goods.


The Project contributes to both the Climate Action and Security & Defence objectives of the Bank.


In terms of technical advice, the EIB will help to ensure that the Project will be implemented in line with the required environmental and procurement standards.


The EIB financial contribution is considered significant, as it will help to provide access to cost-effective long-term funding.

Umweltaspekte
Auftragsvergabe

Where and if applicable, and based on a risk-based approach as defined in the EIB Group Environmental and Social Policy, the requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC, Habitats Directive 92/43/EEC, Marine Strategy Framework Directive 2008/56/EC and Water Framework Directive 2000/60/EC will be checked during appraisal. The Ministry of Ecological Transition (Ministero della Transizione Ecologica), as the environmental competent authority, confirmed the environmental compatibility of the project by issuing the related environmental permit (Decreto di Compatibilità Ambientale) on 4th May 2022. The Natura 2000 areas referred in the environmental permit and considered under the Habitats Directive appropriate assessment (VIncA Valutazione di Incidenza) are: ZSC IT1331615 "Monte Gazzo"; ZSC IT1331606 "Torre Quezzi"; ZSC IT1332576 "Fondali Boccadasse Nervi"; ZSC IT1332575 "Fondali Nervi - Sori"; ZSC IT1332477 "Fondali Arenzano Punta Ivrea". The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and climate adaptation.

The Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The main construction contract (structured under a design and build framework) was awarded after a tender procedure in October 2022 to a consortium led by Webuild also incorporating Fincantieri, Fincosit and SIDRA (Deme Group).

Milestone
Genehmigt
24 September 2025
Projekte zum thema
Link zum projekt
Übersicht

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - BREAKWATER GENOA
Datum der Veröffentlichung
26 Sep 2025
Sprache
Bereich
Finanzierung
Nummer des Dokuments
243976198
Thema
Umweltinformationen
Projektnummer
20230776
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen
Andere Links

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen