17 Juli 2023
Projektstatus
Referenz
Genehmigt | 12/07/2023
20220711
Projekttitel
Projektträger – Finanzintermediär
ENDESA WIND AND SOLAR SECOND ALLOCATION
ENEL GREEN POWER ESPANA SL
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 292 million
EUR 584 million
Ort
Sektor(en)
Beschreibung
Ziele

The operation supports solar and wind renewable energy generation projects in Spain. This is the second allocation under the Framework Loan (FL) 2020-0916, approved by the EIB Board of Directors on 22.07.2021 (CA/545/21/451).

The aim is to contribute to achieve the EU-wide target of reaching 32% of energy from renewable sources in gross final energy consumption by 2030, as set out in the Renewable Energy Directive (EU 2018/2001). It also contributes towards the renewable energy targets outlined in the Spain's National Energy and Climate Plan (NECP). The operation is in line with both the EIB's cohesion financing and with the lending priority related to renewable energy and climate action.

Additionality and Impact

This operation concerns the development and operation of a portfolio of onshore wind and solar PV projects that will contribute to the achievement of the 2030 decarbonisation targets set out in the National Energy and Climate Plan (NECP) of Spain and the REPowerEU action plan. The projects are located in two Cohesion Regions.

The financing of this operation contributes to Bank's lending priority objectives on Renewable Energy, Environmental Sustainability, Climate Action, as well as Economic and Social Cohesion.

The underlying projects produce electricity from low carbon sources (solar PV and on-shore wind), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation).

The underlying projects will rely on revenues from the wholesale market and unsubsidised commercial power purchase agreements (cPPA), thus the operation improves market efficiency and competition. The operation is expected to yield good quality and results, thanks to avoided GHG emissions and fair employment creation.

The promoter has a recognised in-house design and project management capacity with a significant track-record of international energy projects. The project is supported by adequate governance and capabilities of the promoter. 

The EIB's contribution will be most visible on the financial contribution side by accelerating the fundraising process and crowding in other financiers. 

Umweltaspekte
Auftragsvergabe

All projects and grid interconnection infrastructure have required an Environmental Impact Assessment (EIA), including public consultation. The competent authorities considered all the comments presented during the EIA, in line with the legal framework. General quality of the Environmental Impact Studies (EIS), in terms of the impact assessment methodology, studies and fieldwork conducted is considered acceptable. The EIS of each plant and ancillary facilities such as the transmission lines included a cumulative impacts assessment taking into account the neighbouring (existing and planned) infrastructures, including the plants within the relevant cluster. The plants and associated infrastructure obtained their environmental permits (Declaracion de Impacto Ambiental - DIA) between 2018-2022. The wind cluster is in the last stage of construction, with projects already energized in December 2022 and PV schemes are currently under construction with the last plants expected to be operational by end of 2023.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require the promoter to apply those rules.

Milestone
Genehmigt
12 Juli 2023
Projekte zum thema
Link zum projekt

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - ENDESA WIND AND SOLAR SECOND ALLOCATION
Datum der Veröffentlichung
19 Jul 2023
Sprache
Bereich
Finanzierung
Nummer des Dokuments
169215587
Thema
Umweltinformationen
Projektnummer
20220711
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen