Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
165.000.000 €
Länder
Sektor(en)
Frankreich : 165.000.000 €
Verkehr : 165.000.000 €
Unterzeichnungsdatum
18/10/2023 : 82.500.000 €
18/10/2023 : 82.500.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
26 Juni 2023
Projektstatus
Referenz
Unterzeichnet | 18/10/2023
20220471
Projekttitel
Projektträger – Finanzintermediär
MATERIEL ROULANT REGION GRAND EST II
REGION GRAND EST
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 165 million
EUR 517 million
Ort
Sektor(en)
Beschreibung
Ziele

The project concerns the modernisation of multiple units (around 80 electric and 15 bi[1]mode diesel electric), as well as the retrofit with European Railway Traffic Management System (ERTMS) of 16 electric multiple units. The trains will be used for regional rail services across the Grand Est Region, while the ETCS retrofitted units will also be used for rail connections to Luxembourg under public service contracts.

The project is expected to facilitate access to rolling stock by various rail operators and accordingly liberalisation of rail services.

Additionality and Impact

The project is part of a larger fleet renewal programme of the region and consists of modernisation of 107 electric and bimode (diesel /electric) multiple units and retrofit of 16 electric multiple units with European Rail Traffic Management System (ERTMS) on-board units (OBU). 

The modernised rolling stock will contribute to improving the quality of rail services offered in the region, promoting more efficient operation, reducing maintenance costs, and increasing the level of comfort for passengers. Indirectly, by improving services, the project will help railways compete with other modes, particularly private vehicles so as to maintain its modal share. Preventing modal shift from to road may result in reduced vehicle operating costs, safety and environmental benefits.

Furthermore, the ERTMS component will bring improved safety, as well as time savings, reduction of operating and maintenance costs. Regardless of the benefits, ERTMS is a compulsory system to be installed on the TEN-T network to fulfil the European legislative requirements and on-board units are a necessary element to materialize the benefits of the ERTMS. 

The project is located in an EIB cohesion region. 

EIB's loan plays an important role in securing a competitive overall funding of the operation, sending a positive signal to commercial co-funders and contributing to the robustness of the business case. It lowers the Borrower's funding costs and provides a stable long term funding base. 

Umweltaspekte
Auftragsvergabe

The project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive2014/52/EU. The need of EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. In addition, the arrangements for the scrapping of the replaced stock will be checked during appraisal. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail.

The EIB will require the promoter to ensure that contracts for implementation of the components of the project will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. In the case of the new trainsets, the rolling stock is being procured under an existing framework contract, valid until October 2023, for which the contract and award notices were published in the OJEU (2007/S 247-302465; 2009/S 221-317680). This framework was tendered in accordance with the relevant applicable EU procurement legislation at the time of procurement: Directive 2004/17/EC, applicable, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
21 Juli 2023
18 Oktober 2023
Link zum projekt
Andere Links

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - MATERIEL ROULANT REGION GRAND EST II
Datum der Veröffentlichung
26 Jul 2023
Sprache
Bereich
Finanzierung
Nummer des Dokuments
159957902
Thema
Umweltinformationen
Projektnummer
20220471
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen