Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20250239
Veröffentlichungsdatum: 2 Juli 2025

Projektträger – zwischengeschaltetes Finanzinstitut

ROMANIA

Ort

Beschreibung

Situated in Central Romania, within an EIB Cohesion Priority Region, the project involves modernising the 130 km Brasov-Sighisoara double-track electrified railway line, which forms part of the Rhine-Danube Core Trans-European Network (TEN-T) corridor. The upgrade includes an increase in maximum design speed, axle load, and maximum permissible train length, along with the installation of the European Railway Traffic Management System (ERTMS) Level 2. The project will be compliant with the Technical Specifications for Interoperability (TSIs), including the ERTMS installation, which is expected to improve competitiveness of rail versus other modes.

Ziele

The aim is to significantly improve the quality and travel time of the rail connection between Brasov and Sighisoara, leading to time savings, modal shift from road to rail travel - with consequent reduced vehicle operating costs - improved transport safety, and environmental benefits. As a result, the project will contribute to sustainable transport, in line with EU objectives.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 630 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 2250 million

Umweltaspekte

The project falls under Annex I of the Environmental Impact Assessment Directive (EIA) 2011/92/EU amended by Directive 2014/52/EU. The environmental impacts of the project, the EIA procedure as well as the need for assessment according to the Habitats Directive 92/43/EEC and Birds Directive (2009/147/EC) will be analysed during the appraisal. The project is expected to generate modal shift from road to rail with the corresponding environmental benefits in terms of reduction of noise, GHG emissions and pollution. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and pollution prevention and control.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

In Prüfung - 2/05/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Rumänien Verkehr