Referenz: 20240677
Veröffentlichungsdatum: 22 April 2025

Projektträger – zwischengeschaltetes Finanzinstitut

REGION DES PAYS DE LA LOIRE

Ort

Beschreibung

The project consists of the acquisition of 2 new electric rolling stock and renewal of 100 existing electric rolling stock for regional passenger services in the Pays de la Loire region in France.

Ziele

The acquisition of new rolling stock and the modernisation of the existing rolling stock should improve the quality and increase the offer of passenger rail services offered in the Pays de la Loire region, promoting more efficient operation, reducing maintenance costs, lowering energy consumption and increasing the level of comfort for passengers. The project will also focus on local and regional development reforging connections between cities and rural areas. The project will promote sustainable transport as it fosters modal shift from the road and therefore contributes to the reduction of CO2 emissions and pollution levels within and between the regional urban agglomerations. The impact on modal share would also improve transport safety. The rolling stock is expected to be used in a cohesion region (Pays de la Loire).

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 138 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 275 million

Umweltaspekte

The project does not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU. All else equal, the project is expected to have a positive environmental impact by helping the railways to promote modal shift from roads in key sections of the passenger market that are most appropriately served by rail. The project is also expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and pollution prevention and control.

Auftragsvergabe

The Bank will require that all project contracts are procured in accordance with the applicable EU procurement legislation.

Projektstatus

Unterzeichnet - 25/07/2025

Milestone
In Prüfung
Genehmigt
Unterzeichnet
2 Juli 2025
25 Juli 2025

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Frankreich Verkehr