Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20240663
Veröffentlichungsdatum: 15 Oktober 2025

Projektträger – zwischengeschaltetes Finanzinstitut

ACOSOL SAU

Ort

Beschreibung

The project will finance water supply and wastewater schemes from the Promoter's investment programme over the period 2025-2029.

Ziele

The underlying schemes aim to improve the operation of systems and the quality of services provided to municipalities and customers. These include optimising water resource allocation through improved reservoir management and connections between conveyors, investing in energy efficiency to reduce ACOSOL’s carbon footprint, advancing digitalisation, rehabilitating ageing wastewater collection and treatment infrastructure, and promoting wastewater reuse.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 175 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 550 million

Umweltaspekte

The investment is geared toward upgrading water and wastewater infrastructure (water and wastewater treatment plants, networks) bringing positive environmental impacts. The promoter will be required to comply with the EU Water Framework Directive (2000/60/EC), Urban Waste Water Treatment Directive ((2024/3019), and EU and national environmental legislation (notably under EIA Directive 2011/92/EU as amended by the Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC).

Auftragsvergabe

The promoter shall ensure that the contracts for the project implementation will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The procurement procedure has not yet been completed and consequently there is no information on the contractor.

Projektstatus

In Prüfung - 30/01/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Wasser, Abwasser